Sarat
Constraint Violating Yak Guru
USA
265 Posts |
Posted - 01/09/2004 : 17:39:16
|
Hi, I had a job which ran forever and hosed all other jobs later. None of the alerts for the job paged me because the status of the job was neither complete, success or failure. Is there a way to alert you if a job exceeds certain time? I figured out sql statement to put in an stored proc but checking if there is an easy way using EM tool? Thanks, Sarat.
**To be intoxicated is to feel sophisticated, but not be able to say it.** |
|